When you need it
The service is relevant if the company faces the following problems:
- unplanned repairs and breakdown stoppages have become routine;
- maintenance is done late or skipped;
- there is no single schedule for maintenance and repairs;
- overdue and unfinished work keeps piling up;
- the repair crew is overloaded, yet fleet availability stays low;
- equipment waits a long time for spare parts, materials or service resources;
- there is no reliable forecast of upcoming maintenance and repairs;
- production and repair plans are not aligned with each other;
- the load on workshops and repair staff cannot be determined in advance;
- overhauls and equipment rebuilds are carried out without a long-term programme;
- there are no criteria for choosing between repairing, rebuilding and replacing a machine;
- decisions on costly repairs are made only after a failure has occurred;
- fleet availability, reliability and service life need to be improved.
What the client gets
On completion the client receives:
- a structured register of vehicles and maintained equipment;
- the fleet broken down by group, model, criticality and operating conditions;
- a system of maintenance intervals;
- a list of scheduled works and inspection operations;
- a forecast of upcoming maintenance and repairs by running hours and calendar intervals;
- annual, monthly and weekly maintenance plans;
- a long-term programme of equipment repairs and rebuilds;
- a forecast of replacements and rebuilds of major components and assemblies;
- recommendations on choosing between a running repair, a major rebuild and replacing the machine;
- a workload plan for repair staff, workshops and production capacity;
- a calculation of the spare parts, materials, tools and service resources required;
- a system for prioritising repair work;
- a procedure for managing overdue and unfinished work;
- recommendations on building a reserve of spare parts and repair components;
- indicators for tracking plan execution and fleet availability;
- recommendations on reducing unplanned downtime and the cost of owning the equipment.
Where required, a single maintenance and repair planning model is prepared for later use in the company's ERP, EAM or CMMS system.
How the work is done
1. We analyse the fleet
We study the make-up and structure of the fleet, equipment models, operating modes, current running hours, technical condition, existing maintenance standards and the history of maintenance, repairs and failures.
We check that the source data is complete and identify discrepancies that could affect planning accuracy.
2. We build the maintenance structure
For each equipment group we define:
- maintenance types;
- intervals by running hours and calendar time;
- the scope of scheduled work;
- inspection and diagnostic operations;
- standard labour hours;
- the spare parts, materials and tools required.
The structure takes into account manufacturer recommendations, actual operating conditions and the accumulated repair history.
3. We assess the repair workload
We analyse the current and upcoming volume of work and the availability of staff, workshops, tools, spare parts, contractors and service specialists.
We compare the demand for maintenance and repairs with the actual capacity of the repair department and identify the main resource constraints.
4. We forecast maintenance and repairs
Based on current running hours, utilisation, calendar intervals and technical condition, we determine the expected dates of the next service and repair for each unit.
The forecast makes it possible to assess in advance the repair workload, when equipment will be taken out of operation and the resources required.
5. We develop a repair and rebuild strategy
For key units we determine the most appropriate scenario for further operation:
- continued operation with planned maintenance;
- running or component repair;
- replacement of individual components and assemblies;
- overhaul or full machine rebuild;
- staged rebuild depending on component availability;
- decommissioning and replacement of the equipment.
The choice of strategy takes into account:
- the age and current running hours of the machine;
- technical condition and failure history;
- the remaining life of major components;
- the cost and duration of the repair;
- the availability of spare parts and service support;
- the expected remaining service life;
- the impact of downtime on production;
- the cost of a rebuild compared with replacement;
- the risk of repeat failures after the repair.
On this basis a long-term programme of repairs, rebuilds and equipment replacement is developed, with a preliminary estimate of timing, resources and budget.
6. We develop work plans
We prepare long-term, annual, monthly and weekly maintenance and repair plans that take into account:
- the production programme;
- planned running hours;
- equipment availability;
- equipment criticality;
- the chosen repair strategy;
- the capabilities of the repair department;
- staff availability;
- lead times for spare parts and components;
- the availability of contractors and service providers.
7. We set up execution control
We define the rules for tracking:
- completion of planned maintenance;
- running repairs and overhauls;
- delivery of the equipment rebuild programme;
- overdue and unfinished work;
- rescheduled maintenance;
- recurring faults;
- deviations from the approved schedule;
- the accumulated backlog of work.
Each job is assigned a priority, a deadline, a responsible person and its resource requirements.
8. We define performance indicators
We build a set of indicators to monitor:
- technical readiness and availability of the fleet;
- timely completion of maintenance;
- compliance with weekly and monthly plans;
- delivery of the overhaul and rebuild programme;
- the share of planned and unplanned work;
- the number of breakdown repairs;
- the volume of overdue and unfinished work;
- mean time between failures;
- mean repair duration;
- downtime waiting for spare parts;
- the load on repair staff and production capacity;
- the cost-effectiveness of equipment repairs and rebuilds.
The outcome
The company gets a maintenance and repair system it can steer, where it is clear in advance:
- which equipment needs maintenance or repair;
- when the work must be done;
- which machines are worth repairing, rebuilding or replacing;
- which components and assemblies will need replacing;
- what volume of work lies ahead;
- which specialists and production capacity will be needed;
- which spare parts and materials must be prepared;
- which jobs have the highest priority;
- what risks arise when maintenance or repairs are postponed;
- how the repair programme will affect the availability and readiness of the whole fleet.
This makes it possible to move from reacting to failures to systematic management of the equipment life cycle, to plan repairs and machine rebuilds on time, to reduce unplanned downtime and to allocate the repair budget on sound grounds.